The ladies don't start VBS until after
school, so they asked if there was anything they could help with in the morning.
We had mentioned the need to move a stack of about 600 blocks from the front of
the site to where they are needed; and before anyone knew it, a human chain was
formed, and before long the stack was gone!

The Director's House team finished the floor of the second floor with the
invaluable assistance of Graham and Ben lugging and passing up the sheets of
plywood (they are extremely heavy!)
Meanwhile Chad, John and Brad started the
block walls for the House Parents' room and bath in Phase One.
As soon as the columns were done and the
scaffolds removed, we started bringing in fill (4 truckloads) to even out the
ground between Phase One and the Director's House. That Melissa swings a mean
shovel!
What a day! The floor of the second level
of the Director's house is done; the columns are done, the porch is started, as well
as the interior walls of Phase One. Blocks and fill were moved. The ladies did
VBS in both orphanages and did a mini-VBS in the community across the road that
attracted over 40 kids. They are traveling far and wide with their evangelism,
even to the tent city down the road, and are expecting a big turnout for the
women's Bible study Thursdsy morning. A lot of the guys got to go over and
charge their batteries visiting and playing with the kids. This team's
enthusiasm and hard work both inside and outside of the orphanage has set a new
bar for following teams. Please pray for continued health and safety for the
team, and that the Lord will show us all the ways we can serve Him while we are
here.













No comments:
Post a Comment