Another beautiful day, and back to the wall of the Phase
One building.
We have to go up 14 feet on the front wall to catch the
almost constant breeze from the East, so 10 more layers of block above the bond
beam on that side, sloping down to 7 blocks at the back. Bill Jones took the
"lead" on the "leads." with Andy and Stephen up on the
scaffolds with him.
Scaffolding was a problem, so some of the others made 4
new, wider ones to make things go faster.
That's better! Now things are going faster.
And with the leads done, the wall is getting filled in
fast. Almost ready for some grout.
We decided that having the storeroom completed in the
Pastor House as soon as possible would be a very big blessing, so part of the
team spent the afternoon finishing up the framing for it, and since we will
have a cement mixer tomorrow, we can pour it. We also cut and wired up the
rebar for the water tank footer, so we can pour that too. Things are running
along nicely, and everyone is looking forward to the traditional Tuesday
afternoon visit with the children. Praise the Lord for keeping us safe and
well, and for His guidance in all we are doing.